Team:Valencia/Notebook/Week3

From 2011.igem.org

Revision as of 20:57, 21 September 2011 by Bea sl 88 (Talk | contribs)



WEEK 3
Hardware: The material use in laboratories is too expensive, so engineers put their mind to work in order to find a cheap solution. The first draft with different possible solutions is made. The corresponding membranes to bacteriocins are donated from a department in UPV and the first experiments are done. Thanks a lot!!!

pH-stat: We arranged the work surface for the culture of Synechocystis in the laboratory with capacity to perform two simultaneous experiments.

Colicin production:After choosing the project, we start documenting about antimicrobial peptides and possible candidates to use in our project. How to get them? Where to ask? ....
Notebook Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Project