Team:UTP-Panama/Week 6

From 2011.igem.org

(Difference between revisions)
(July 16)
m (July 16)
 
(6 intermediate revisions not shown)
Line 15: Line 15:
=====Abstract Due=====
=====Abstract Due=====
Debates and discussion about what would be the UTP-Panama Team project and vision for the 2011.
Debates and discussion about what would be the UTP-Panama Team project and vision for the 2011.
-
We finally choose the "SynBio Engineering Tool Kikt" as a framework to develop our project. In this way the team propouse select some tracks of application of synbio as the possible final project for the 2011 Project.
+
We finally choose the "SynBio Engineering Tool Kit" as a framework to develop our project. In this way the team proposed to select some tracks of application of synbio as the possible final project for the 2011 Project.
-
 
+
-
 
+
===July 15===
===July 15===
Line 26: Line 24:
'''Human practice'''
'''Human practice'''
-
Meeting: We were planning our objectives and activities of our sub-team, asking issues like: ¿How do we introduce the SynBio in the Panamanian culture and discuses the pros and cons about the SynBio in our culture and cultural background. And also we discussed the engineer’s role in the SynBio.
+
Meeting: We were planning our objectives and activities of our sub-team, addressing issues such as: How do we introduce the SynBio in the Panamanian culture? .Then we discussed the pros and cons about the SynBio introduction in our culture. We also exchanged some ideas about the engineer’s role in the SynBio.

Latest revision as of 04:56, 28 September 2011


DSCF7003.jpg

Logoigempeginav1.png

Home

The Team

The Project

Parts

Project & Experiments Design

Human Practices

Notebook

Gallery

Safety

Data Page

Sponsors

Center




Week 6: July 11 to 16

July 12

Work Session #20 (afternoon)

Project

In this meeting we presented project propousals and ideas for the UTP-Panama Team 2011. Selection of the Concept Engineering Tool kit as a UTP-Panama Long-Term goal in SynBio. SynBio Engineering Tool Kit: develop of biotechnology parts and devices (tools) to solve traditional Engineering problems.

July 14

Work Session #21 (9 am to 4 pm)

Abstract Due

Debates and discussion about what would be the UTP-Panama Team project and vision for the 2011. We finally choose the "SynBio Engineering Tool Kit" as a framework to develop our project. In this way the team proposed to select some tracks of application of synbio as the possible final project for the 2011 Project.

July 15

Writing the Abstract. This day, we write a general view of all that our team have been doing and thinking since Team conformation.

July 16

Human practice

Meeting: We were planning our objectives and activities of our sub-team, addressing issues such as: How do we introduce the SynBio in the Panamanian culture? .Then we discussed the pros and cons about the SynBio introduction in our culture. We also exchanged some ideas about the engineer’s role in the SynBio.