Team:Valencia/Notebook/Week3

From 2011.igem.org

(Difference between revisions)
 
Line 261: Line 261:
<div class=col_center_top><b>WEEK 3</b></div><!-- fin clase col_left_top-->
<div class=col_center_top><b>WEEK 3</b></div><!-- fin clase col_left_top-->
<div class=col_center_center>
<div class=col_center_center>
-
<b>Engineering:</b> The material use in laboratories is too expensive, so engineers put their mind to work in order to find a cheap solution.
+
<b>Engineering:</b> The material used in laboratories is normaly quite  expensive, so we engineers put our mind to to find cheaper solutions.
-
The first draft with different possible solutions is made.
+
The first draft for our machine has been made.
-
The corresponding membranes to bacteriocins are donated from a department in UPV and the first experiments are done. Thanks a lot!!!
+
The corresponding membranes for bacteriocins separation are donated from a department from our university and the first experiments are done. Thanks a lot!!!
<br><br>
<br><br>
<b>pH-stat:</b> We arranged the work surface for the culture of  <i>Synechocystis</i> in the laboratory with capacity  to perform two simultaneous experiments.  
<b>pH-stat:</b> We arranged the work surface for the culture of  <i>Synechocystis</i> in the laboratory with capacity  to perform two simultaneous experiments.  

Latest revision as of 03:50, 22 September 2011



WEEK 3
Engineering: The material used in laboratories is normaly quite expensive, so we engineers put our mind to to find cheaper solutions. The first draft for our machine has been made. The corresponding membranes for bacteriocins separation are donated from a department from our university and the first experiments are done. Thanks a lot!!!

pH-stat: We arranged the work surface for the culture of Synechocystis in the laboratory with capacity to perform two simultaneous experiments.

Colicin production: After choosing the project, we start documenting about antimicrobial peptides and possible candidates to use in our project. How to get them? Where to ask? ....
Notebook Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Project