Team:UCL London/Manufacturing/PurityYieldCost/Analysis

From 2011.igem.org

(Difference between revisions)
(Created page with "{{:Team:UCL_London/Template/Header}}<html> <div id="submenu" class="sm-manufacturing-purityyieldcost"> <div id="manufacturing-industryoverview"><a href="https://2011.igem.org/Team...")
Line 7: Line 7:
Assume the yields of each steps are as labelled in the flow diagram [6], yield, purity and cost analyses were generated with the aid of SuperPro Designer® by Intelligen Inc. for both the current process and the process involved E.coili cell factory.  
Assume the yields of each steps are as labelled in the flow diagram [6], yield, purity and cost analyses were generated with the aid of SuperPro Designer® by Intelligen Inc. for both the current process and the process involved E.coili cell factory.  
-
https://2011.igem.org/File:Ucl-content-Manufacturing-figure2.jpg
+
[[File:Ucl-content-Manufacturing-figure2.jpg|center]]
 +
 
 +
[[File:Ucl-content-Manufacturing-figure3.jpg|center]]
-
https://2011.igem.org/File:Ucl-content-Manufacturing-figure3.jpg
 
</div>
</div>
{{:Team:UCL_London/Template/Footer}}
{{:Team:UCL_London/Template/Footer}}

Revision as of 22:17, 21 September 2011

Analysing Results

Assume the yields of each steps are as labelled in the flow diagram [6], yield, purity and cost analyses were generated with the aid of SuperPro Designer® by Intelligen Inc. for both the current process and the process involved E.coili cell factory.

Ucl-content-Manufacturing-figure2.jpg
Ucl-content-Manufacturing-figure3.jpg