Team:Wageningen UR/Notebook/Proj2/April

From 2011.igem.org

(Difference between revisions)
(April - Fungal Track 'n Trace)
(April - Fungal Track 'n Trace)
 
(22 intermediate revisions not shown)
Line 1: Line 1:
-
<!-- *** The following section shouldn't be edited if you are not completely sure about what you are doing. *** -->
+
<html>
 +
<head>
 +
<style type="text/css">
 +
 
 +
ul li a.currentlinkfungus3 {
 +
color: black !important;
 +
}
 +
 
 +
ul li a.currentlinktop3 {
 +
color: #63a015 !important;
 +
}
 +
 
 +
ul li a.currentlinktop4 {
 +
color: black !important;
 +
display: block;
 +
}
 +
 
 +
ul li a.currentlinkthird3 {
 +
color: #88f003 !important;
 +
display: block;
 +
}
 +
 
 +
</style>
 +
</head>
 +
<bod>
 +
</body>
 +
 
 +
</html>
 +
{{:Team:Wageningen_UR/Templates/Header}}
 +
{{:Team:Wageningen_UR/Templates/NavigationTop1}}
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
-
{{:Team:Wageningen_UR/Templates/HeaderFooterStyle}}
 
-
{{:Team:Wageningen_UR/Templates/NavigationLeft2}}
 
== April - Fungal Track 'n Trace ==  
== April - Fungal Track 'n Trace ==  
-
<html>
+
{{:Team:Wageningen_UR/Templates/NavigationLeft3}}
-
  <head>
+
{{:Team:Wageningen_UR/Templates/NavigationTop4}}
-
  <style type="text/css">
+
{{:Team:Wageningen_UR/Templates/Style | text= __NOTOC__
-
  </style> 
+
-
  </head>
+
-
  <body>
 
-
<!-- *** End of the "please do not edit" section. For the rest: Go ahead! :) *** --> </html>
 
-
{|- style="background:{{{color1|#005172}}};"
 
-
|colspan="7"|<span style="color:white;">[https://2011.igem.org/Team:Wageningen_UR/Notebook/Proj2/March Previous Month]</span>
 
-
|- style="background:{{{color2|#507d95}}};"
 
-
|}<noinclude>
 
-
{|- style="background:{{{color1|#005172}}};"
 
-
|colspan="7"|<span style="color:white;">[https://2011.igem.org/Team:Wageningen_UR/Notebook/Proj2/May Next Month]</span>
 
-
|- style="background:{{{color2|#507d95}}};"
 
-
|}<noinclude> <html>
 
 +
[[File:Apr2.png]]
-
<div><a name="April5">April 5</a></div>
+
'''April 5'''
-
<span style="color:white; text-align:justify;"> <!-- *** add text here :) *** -->
+
-
</span>
+
-
</html>
+
 +
The Fungus Work Plan was presented to Leo de Graaff last Friday. For now a more detailed script should be made, which contains all necessary information of all the practical work.
-
<html>
 
-
<div><a name="April12">April 12</a></div>
 
-
<span style="color:white; text-align:justify;"> <!-- *** add text here :) *** -->
 
-
</span>
 
-
<html>
+
'''April 12'''
-
<div><a name="April21">April 21</a></div>
+
 
-
<span style="color:white; text-align:justify;"> The ''A.nidulans'' strain we ordered from the FGSC arrived today!  
+
The maximum estimated cost of the synthesis of our constructs is about 5.500 euro's. Strain selection has not been done jet: there were some problems with the strains. The Fungus Work Plan is being worked on.
-
</span>
+
 
 +
 
 +
'''April 21'''
 +
 
 +
The ''A. nidulans strain'' (A1147) we ordered from the FGSC arrived today!  
 +
 
 +
 
 +
'''April 27'''
 +
 
 +
''A. nidulans'' strain A1147 inoculated on complete medium plate complemented with vitamin solution (riboflavin), uridine and p-aminobenzoicacid. Grown overnight at 37°C.
 +
 
 +
 
 +
'''April 29'''
-
<!-- *** The following section shouldn't be edited if you are not completely sure about what you are doing. *** -->
+
''A. niger'' strains with GFP, RFP and YFP were received on plates. These strains were donated by A. Vinck. We will use these strains to familiarize ourselves with the microscope. The plates were left during the weekend at room temperature.
-
  </body>
 
-
  </html>
+
[https://2011.igem.org/Team:Wageningen_UR/Notebook/Proj2/March Previous Month]
-
<!-- *** End of the "please do not edit" section. For the rest: Go ahead! :) *** -->
+
[https://2011.igem.org/Team:Wageningen_UR/Notebook/Proj2/May Next Month]
 +
}}

Latest revision as of 20:24, 21 September 2011

Building a Synchronized Oscillatory System





April - Fungal Track 'n Trace



Apr2.png

April 5

The Fungus Work Plan was presented to Leo de Graaff last Friday. For now a more detailed script should be made, which contains all necessary information of all the practical work.


April 12

The maximum estimated cost of the synthesis of our constructs is about 5.500 euro's. Strain selection has not been done jet: there were some problems with the strains. The Fungus Work Plan is being worked on.


April 21

The A. nidulans strain (A1147) we ordered from the FGSC arrived today!


April 27

A. nidulans strain A1147 inoculated on complete medium plate complemented with vitamin solution (riboflavin), uridine and p-aminobenzoicacid. Grown overnight at 37°C.


April 29

A. niger strains with GFP, RFP and YFP were received on plates. These strains were donated by A. Vinck. We will use these strains to familiarize ourselves with the microscope. The plates were left during the weekend at room temperature.


Previous Month

Next Month