Team:Wageningen UR/Notebook/Proj1/April

From 2011.igem.org

(Difference between revisions)
(April)
 
(24 intermediate revisions not shown)
Line 1: Line 1:
-
<!-- *** The following section shouldn't be edited if you are not completely sure about what you are doing. *** -->
+
<html>
 +
<head>
 +
<style type="text/css">
-
{{:Team:Wageningen_UR/Templates/HeaderFooterStyle}}
+
ul li a.currentlink4 {
-
{{:Team:Wageningen_UR/Templates/NavigationLeft2}}
+
color: black !important;
 +
}
-
== April - Synchronised Oscillatory System ==
+
ul li a.currentlinktop3 {
 +
color: #63a015 !important;
 +
}
-
<html>
+
ul li a.currentlinktop4 {
-
  <head>  
+
color: black !important;
-
  <style type="text/css">
+
display: block;
-
  </style>  
+
}
-
  </head>
+
 
 +
ul li a.currentlinksecond3 {
 +
color: #88f003 !important;
 +
display: block;
 +
}
 +
 
 +
</style>
 +
</head>
 +
<bod>
 +
</body>
 +
</html>
 +
{{:Team:Wageningen_UR/Templates/Header}}
 +
{{:Team:Wageningen_UR/Templates/NavigationTop1}}
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
 
 +
== April - Synchronized Oscillatory System ==
 +
 
 +
{{:Team:Wageningen_UR/Templates/NavigationLeft}}
 +
{{:Team:Wageningen_UR/Templates/NavigationTop6}}
 +
{{:Team:Wageningen_UR/Templates/Style | text= __NOTOC__
 +
[[File:Apr.png]]
 +
 
 +
'''April 5'''
-
  <body>
+
This week a work plan will be constructed for the oscillation project.
-
<!-- *** End of the "please do not edit" section. For the rest: Go ahead! :) *** -->
 
 +
'''April 12'''
 +
The work plan for the oscillation project is still in progress. Rob suggested to work with luciferase instead of GFP for the oscillation project because he already has experience with luciferase. He will check the technical details for this. It is not possible to get a microfluidics devices such as the one used in Danino et al. 2010. But it might be possible to get a different device which could work.
 +
'''April 15'''
-
<!-- *** The following section shouldn't be edited if you are not completely sure about what you are doing. *** -->
+
Meeting with the experts about the oscillation work plan.
-
  </body>
 
-
  </html>
+
[https://2011.igem.org/Team:Wageningen_UR/Notebook/Proj1/March Previous Month]
-
<!-- *** End of the "please do not edit" section. For the rest: Go ahead! :) *** -->
+
[https://2011.igem.org/Team:Wageningen_UR/Notebook/Proj1/May Next Month]
 +
}}

Latest revision as of 17:58, 21 September 2011

Building a Synchronized Oscillatory System





April - Synchronized Oscillatory System

Apr.png

April 5

This week a work plan will be constructed for the oscillation project.


April 12

The work plan for the oscillation project is still in progress. Rob suggested to work with luciferase instead of GFP for the oscillation project because he already has experience with luciferase. He will check the technical details for this. It is not possible to get a microfluidics devices such as the one used in Danino et al. 2010. But it might be possible to get a different device which could work.


April 15

Meeting with the experts about the oscillation work plan.


Previous Month

Next Month