Team:UANL Mty-Mexico/Wet lab/Constructions

From 2011.igem.org

(Difference between revisions)
Line 125: Line 125:
  <p>
  <p>
   
   
-
  Construction of whole circuits for this project was planed as detailed in the next three figures:
+
  Construction of whole circuits for this project was planed as detailed in the next three figures. Briefly, it consisted on joining CDS to RBS and terminator in the first stage, this for constructing almost complete genes. This constructions would allow combination of multiple joint to different promoters.
 +
 
 +
<i>Note: Original idea for circuit was planed to be regulated through chemical inputs or light induction systems</i>
   
   
  </p>
  </p>

Revision as of 04:03, 29 September 2011

banner-main iGEM-logo
Team: UANL_Mty-Mexico Team: UANL_Mty-Mexico
WetLab: Circuit construction
Construction Plans

Construction of whole circuits for this project was planed as detailed in the next three figures. Briefly, it consisted on joining CDS to RBS and terminator in the first stage, this for constructing almost complete genes. This constructions would allow combination of multiple joint to different promoters. Note: Original idea for circuit was planed to be regulated through chemical inputs or light induction systems

OurSymbol

Team: UANL_Mty-Mexico