Team:Caltech/Week 8

From 2011.igem.org

Revision as of 21:43, 1 August 2011 by Jbrown2 (Talk | contribs)


Caltech iGEM 2011



Home

Project

Data

Parts

Team

Notebook

Biosafety

Human Impact

References

Support

July 31

Started a LB+amp overnight culture of the B0034 glycerol stock from the 2010 Caltech iGEM Team

August 1

PCR pSB3K3 and pNT003 insert with the new primers.
Gel extract the pNT002 insert from the July 29 PCR
Gibson assemble the PCR'd pNT003 insert and pSB4A5 together if the insert is at a sufficient concentration
Minimal media transfers

Results

The enrichment culture plates show no visible growth yet.

August 2

Gibson assemble pNT002 using the gel extracted insert and linearized pSB3K3


Retrieved from "http://2011.igem.org/Team:Caltech/Week_8"