Team:Peking R/Notebook/ZZR

From 2011.igem.org

Revision as of 13:39, 16 September 2011 by Grasscliff (Talk | contribs)

Template:Https://2011.igem.org/Team:Peking R/bannerhidden Template:Https://2011.igem.org/Team:Peking R/back2 Template:Https://2011.igem.org/Team:Peking R/Notebookbackground 无标题文档

Zhenrun Zhang's Notebook

 

 

I participate in designing the project and detailing the experiments. Particularly I'm in charge of constructing vio operon parts containing ribozymes so that we can enhance the product purity of the metabolic pathway.

 
  Download his note  
Contents:

*July,2011
*Augest,2011
*September,2011
*October,2011

 
July
Sun. Mon. Tue. Wed. Thu. Fri. Sat.
- - - - - 1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31 - - - - - -

[Top]
 

7.1--7.7

 

 

 

7.8-7.14

 

7.15-7.20

 

 

7.21-7.28

Construted Terminator-pBAD promoter for part assembly in the next step.

7.29-7.31

Attended iGEM 2011 China Meetup

Augest

Sun. Mon. Tue. Wed. Thu. Fri. Sat.
- 1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31 - - -

[Top]
 

8.1-8.5

had a few days’ holiday.

8.6-8.13

Tested violacein characterization by TLC (developed by dichloromethane: methanol = 6:1 (v/v)) and spectrophotometry (absorbance wavelength=570nm).

 

8.14-8.18

8.19-8.25

8.26-8.31

 

 

 

 

 

 

September

Sun. Mon. Tue. Wed. Thu. Fri. Sat.
- - - - 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 -

[Top]
 

9.1-9.8

9.9-9.15

9.16-9.22

9.23-9.30

 

 

 

 

October

Sun. Mon. Tue. Wed. Thu. Fri. Sat.
- - - - - - 1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31 - - - - -

[Top]
 

10.1-10.4

 

 

 
==click here to his page==
==click here to return==