Team:Caltech/Week 8

From 2011.igem.org

Revision as of 18:25, 3 August 2011 by Asu4 (Talk | contribs)


Caltech iGEM 2011



Home

Project

Data

Parts

Team

Notebook

Biosafety

Human Impact

References

Support

July 31

Started a LB+amp overnight culture of the B0034 glycerol stock from the 2010 Caltech iGEM Team

Results

Mass spectrometry did not run correctly; samples did not ionize; must rerun

August 1

PCR pSB3K3 and pNT003 insert with the new primers.
Gel extract the pNT002 insert from the July 29 PCR
Minimal media transfers
Transformation and plating of pUC19 into competent cells for cell dry weight experiment
Overnight culture of B0034 glycerol stock
Overnight ligation of pNT002 insert and PSB3K3 backbone
Restriction digest of parts for pNT002 standard assembly and overnight ligation

Results

No colonies visible on the pUC19-transformed cells

The enrichment culture plates show no visible growth yet.

Gel Extractions of July 29 PCR of pNT002 and pNT003 inserts

Part Concentration (ng/ul)
pNT002 insert 65.9
pNt003 insert 12.5

August 2

Gibson assemble pNT002 using the gel extracted insert and linearized pSB3K3
Gibson assemble pNT003 using the gel extracted insert and linearized pSB4A5
Replating of more pUC19-transformed competent cells and non-transformed competent cells
Standard Assembly Digest- K12300, B1004, R0010, B0034, along with the destination plasmids.
Run gel of overnight pNT002 ligations
Transformed pNT002 insert+ pSB3K3 ligation

Results

pNT002 ligation showed band on gel


Retrieved from "http://2011.igem.org/Team:Caltech/Week_8"