Team:Lyon-INSA-ENS/Realisation/Week5

From 2011.igem.org

Revision as of 17:02, 19 September 2011 by Chambi (Talk | contribs)









Week 5


From Monday the 11th of July to Friday the 15th of July 2011







Monday


Visit of Centraco : a french nuclear waste treatment plant


Strain construction

Start of 5mL cultures of 18A (Amp), 24E (Amp) and Curli(Cn). Incubation at 37°C
Start of 50 mL cultures ( 50mL sterile LB, 500µL antibiotic, 100µL from the 5mL cultures ). Incubation at 37°C overnight.





Tuesday




Strain construction

Miniprep of the ligations from the previous week to check the insert : 5L+2L, 5L+24E, 2M+2L, 2M+24E, 2L-Tet, 24E-Tet
4 clones are chosen for each ligation.
Digestion and electrophoresis : no clone seemed to contain the insert. Decision to verify the digestion, ligation and transformation protocols.


Midiprep of 18A, 24E and curli parts.
Nanodrop analysis :
-18A : 16.7 ng/µL
-Curli : 40.5 ng/µL
-24E : 190.8 ng/µL


PCR and mutagenesis of rcn, csgBA, csgEFG

The sequencing results were not enough good due to too high concentration of mutated plasmid. Resent of dillute sample.





Wednesday


Another french newspaper "Le progrès" interviewed us.


Strain construction

Start of 5mL cultures of 22M, 2M, 2L, 5L, OmpR234 and RBS-GFP-LVA ( synthesized part with an unstable GFP )

Start of 50mL cultures for the same parts.


PCR and mutagenesis of rcn, csgBA, csgEFG

Miniprep of the clones with the mutated plasmid to get more plasmid for the next step.





Thursday


French national day but... we worked.


Strain construction

Midiprep of 22M, 2M, 2L, 5L, OmpR234, RBS-GFP-LVA.








ENS assystem Biomérieux INSA INSA