===July 8=== | ===July 8=== | ||
* Minipreps for 1, 3 and 4 were made. | * Minipreps for 1, 3 and 4 were made. | ||
+ | * Plant sheets of coffee into different plates: Each sheet was cut in the middle and they were incubated at 25°C and 37°C LB+Kan. | ||
+ | Task: | ||
+ | To finish the minipreps from the addition of RNAsa. | ||
+ | Check the E. Coli growth in coffee. | ||
+ | ===July 11=== | ||
+ | * Minipreps have been finished. They've been planted in gel: Low concentration (25 ng/uL). | ||
+ | * Transformation protocol in chemical cells. | ||
+ | Task: | ||
+ | Prepare 250 mL of SOC medium | ||
+ | ===July 12=== | ||
* | * | ||
- | + | =='''August'''== | |
- | + |
Revision as of 04:23, 16 August 2011
Home | Team | Official Team Profile | Project | Parts Submitted to the Registry | Modeling | Notebook | Safety | Attributions |
---|
Contents |
Daily iGemWork
Here you can find our daily work in the Lab!
June
June 30:
- Biobricks 1, 2, 3, 4 and 5 were resuspended
- Miniprep Solutions (I, II and III) were prepared.
July
July 1
- Biobricks 1, 2, 3, 4 and 5 were resuspended.
July 5
- Biobrick 2 presented no colonies.
- Colonies from bricks 1, 3, 4 and 5 were stinged.
Task: To make LB medium (15x25mL)
July 6
- Biobricks 1, 3 and 4 were twice plated.
- Brick 5 didn't grow up.
- We've added Ampiciline (3.75mL) and Kanamicine (1.875mL) to the boxed from the previous day.
- LB medium was prepared (15x25mL).
- Liquid LB was prepared (400mL).
Task: To add ampiciline and tetracicline to the boxes. Claim the liquid LB Scrape .... Sting biobricks 2 and 5 (no clons) Pick up the tubes with Merceditas
July 7
- Clons 2 and 5 didn't work out.
- Clons 1, 3 and 4 were planted in LB liquid.
- E. Coli inoculation in Coffee
- Kanamicine resistence plasmid: 0.2 optic density.
- Direct inoculation x 2 and C(-) MgCl2.
Task: Print electroporation protocol. Ask Juan D. Olarte about the inoculation in coffee. Minipreps for confirmation of 1, 3 and 4. Competent cells for clones 2 and 5.
July 8
- Minipreps for 1, 3 and 4 were made.
- Plant sheets of coffee into different plates: Each sheet was cut in the middle and they were incubated at 25°C and 37°C LB+Kan.
Task: To finish the minipreps from the addition of RNAsa. Check the E. Coli growth in coffee.
July 11
- Minipreps have been finished. They've been planted in gel: Low concentration (25 ng/uL).
- Transformation protocol in chemical cells.
Task: Prepare 250 mL of SOC medium