Team:British Columbia/Notebook/4 July 2011
From 2011.igem.org
(Difference between revisions)
(→IDI1, HMG2, erg20-2) |
(→July 04 2011) |
||
Line 9: | Line 9: | ||
====1,8-Cineole==== | ====1,8-Cineole==== | ||
*Ran a gel to test restriction digest and variant SDM-PCR product. | *Ran a gel to test restriction digest and variant SDM-PCR product. | ||
+ | |||
+ | ====beta-pinene==== | ||
+ | *SDM beta-pinene again by using both Pfu and Taq. | ||
+ | *Gel verification shows a smear. | ||
+ | *Troubleshooting: run a gel on the miniprep of the beta-pinene plasmid received from Rafael to make sure that the DNA hasn't been contaminated/digested. |
Revision as of 18:51, 19 July 2011
Contents |
July 04 2011
Week of Jun27 - Jul04
IDI1, HMG2, erg20-2
- Validated competent cells by transforming with pet100 vector containing Cineole synthase. They are in working order.
- Amplified 5 plasmids received from Greece (IDI1, HMG2, p300, Cin, Sab). NOTE: did not properly centrifuge during DNA precipitation stage. Will validate plasmids in yeast transformations to make sure plasmids are in working order.
- Awaiting materials from France (erg20-2).
1,8-Cineole
- Ran a gel to test restriction digest and variant SDM-PCR product.
beta-pinene
- SDM beta-pinene again by using both Pfu and Taq.
- Gel verification shows a smear.
- Troubleshooting: run a gel on the miniprep of the beta-pinene plasmid received from Rafael to make sure that the DNA hasn't been contaminated/digested.