Team:Caltech/Week 4
From 2011.igem.org
Line 4: | Line 4: | ||
==July 3== | ==July 3== | ||
===Results=== | ===Results=== | ||
- | There was no growth on the transformed Gibson plates. Since we did a small reaction, we used all of the reaction in transforming competent cells. The Gibson assembly likely failed, as one of the negative control plates had a single colony.<br/><br/> | + | There was no growth on the transformed Gibson plates. Since we did a small reaction, we used all of the reaction in transforming competent cells. The Gibson assembly likely failed, as one of the negative control plates had a single colony. However, we have had trouble with our competent cells in the past and will try plating what we have left.<br/><br/> |
Gibson Transformations | Gibson Transformations | ||
<table border="1"> | <table border="1"> |
Revision as of 18:09, 3 July 2011
Project |
July 3ResultsThere was no growth on the transformed Gibson plates. Since we did a small reaction, we used all of the reaction in transforming competent cells. The Gibson assembly likely failed, as one of the negative control plates had a single colony. However, we have had trouble with our competent cells in the past and will try plating what we have left.
This WeekStart enrichment cultures from a previous iteration, as the latest dilutions remain clear.
|