Team:Lethbridge/Notebook/Lab Work/Group2
From 2011.igem.org
Line 62: | Line 62: | ||
A test is done using different generic primers and two different polymerases on a confirmed plasmid. The polymerase that produces adenine overhangs successfully produces a band of the expected size. Using this polymerase, another PCR of xylE is attempted, the largest yet, with a slightly longer elongation time and a wide variety of annealing temperatures and magnesium concentrations. All twenty four unique reactions produced a band at the expected size of xylE. <br> | A test is done using different generic primers and two different polymerases on a confirmed plasmid. The polymerase that produces adenine overhangs successfully produces a band of the expected size. Using this polymerase, another PCR of xylE is attempted, the largest yet, with a slightly longer elongation time and a wide variety of annealing temperatures and magnesium concentrations. All twenty four unique reactions produced a band at the expected size of xylE. <br> | ||
'''Week 15 August 8 - 14''' <br> | '''Week 15 August 8 - 14''' <br> | ||
- | The xylE PCR products had the original host plasmids removed in a digest before they were cloned using the newly arrived pGEM-T vector cloning system from Promega. PCR producing adenine overhangs for mms6 were completed successfully before they were gel extracted and cloned using the new system. Colonies of both <br> | + | The xylE PCR products had the original host plasmids removed in a digest before they were cloned using the newly arrived pGEM-T vector cloning system from Promega. PCR producing adenine overhangs for mms6 were completed successfully before they were gel extracted and cloned using the new system. Colonies of both cloning were picked grown in liquid media and mini-prepped. Restricting these isolated plasmids and running on a gel shows bands of expected sizes. <br> |
'''Week 16 August 15 - 21''' <br> | '''Week 16 August 15 - 21''' <br> | ||
+ | <br> | ||
'''Week 17 August 22 - 28''' <br> | '''Week 17 August 22 - 28''' <br> | ||
+ | Ryan is on vacation on Vancouver island. The arginine tag is assembled onto xylE. | ||
'''Week 18 August 29 - September 4''' <br> | '''Week 18 August 29 - September 4''' <br> | ||
'''Week 19 September 5 - 11''' <br> | '''Week 19 September 5 - 11''' <br> |
Revision as of 06:34, 15 September 2011
|
|
|
---|