Team:Lyon-INSA-ENS/Realisation/Week18

From 2011.igem.org

(Difference between revisions)
(Created page with "{{Lyon-INSA-ENS/header}} {{Lyon-INSA-ENS/blocStyle}} {{INSA-Lyon/styletestaurelie}} {{Lyon-INSA-ENS/menuhorizontal}} {{Lyon-INSA-ENS/menuNotebookVertical|Week 18 = actif}} <htm...")
 
(3 intermediate revisions not shown)
Line 38: Line 38:
     <br/> <br/>
     <br/> <br/>
 +
<h6 style="text-align :left"> Monday </h6> <HR>
 +
<br/>
 +
<p style=" line-height : 1.5em">
 +
<FONT COLOR="red"> <b>Strain construction</b> </FONT> <br/><br/>
 +
 +
Extraction, EP Digestion and Gel electrophoresis of the NM522/p85 clones. They are all good.
 +
 +
 +
  <p/>
 +
  <br/><br/>
 +
 +
 +
 +
<h6 style="text-align :left"> Tuesday </h6> <HR>
 +
<br/>
 +
<p style=" line-height : 1.5em">
 +
<FONT COLOR="red"> <b>Strain construction</b> </FONT> <br/><br/>
 +
 +
Transformations : MC4100/pIG2+p150, MC4100/pIG6+p150.
 +
Some problems with the transformations were noticed (only few clones), caused probably by the fact that the TSS wasn't fresh, so a new solution has been made and used.
 +
 +
  <p/> 
 +
 +
<br/><br/>
 +
 +
 +
 +
<h6 style="text-align :left"> Wednesday </h6> <HR>
 +
<br/>
 +
<p style=" line-height : 1.5em">
 +
<FONT COLOR="red"> <b>Strain construction</b> </FONT> <br/><br/>
 +
Transformations results : no clones for MC4100/pIG2+p150, MC4100/pIG6+p150.<br/>
 +
Transformations: MC4100/p85, PHL1414+piG3.
 +
<p/>
 +
  <br/><br/>
 +
 +
 +
<h6 style="text-align :left"> Friday </h6> <HR>
 +
<br/>
 +
<p style=" line-height : 1.5em">
 +
<FONT COLOR="red"> <b>Strain construction</b> </FONT> <br/><br/>
 +
A 5ml liquid cultured for 4 clones of PHL1414/pIG3 and 4 clones of MC4100/p85 is started.<br/>
 +
Extraction and digestion by E and P.
 +
The four clones of MC4100/p85 are good.
 +
<p/>
 +
  <br/><br/>
Line 43: Line 89:
     <br/> <br/>
     <br/> <br/>
     <br/> <br/>
     <br/> <br/>
 +
 +
  <p>
 +
              <a  href="https://2011.igem.org/Team:Lyon-INSA-ENS/Realisation/Week17"/><font color="grey"><b>Previous Week</b></font></a>
 +
              <a  style = "float : right"; href="https://2011.igem.org/Team:Lyon-INSA-ENS/Realisation/Week19"/><font color="grey"><b>Next Week</b></font></a>
 +
              <br/>
 +
    </p>
 +
     <br/> <br/>
     <br/> <br/>
</div>
</div>

Latest revision as of 18:20, 27 October 2011









Week 18


From Monday the 17th of October to Sunday the 23rd of October 2011







Monday


Strain construction

Extraction, EP Digestion and Gel electrophoresis of the NM522/p85 clones. They are all good.



Tuesday


Strain construction

Transformations : MC4100/pIG2+p150, MC4100/pIG6+p150. Some problems with the transformations were noticed (only few clones), caused probably by the fact that the TSS wasn't fresh, so a new solution has been made and used.



Wednesday


Strain construction

Transformations results : no clones for MC4100/pIG2+p150, MC4100/pIG6+p150.
Transformations: MC4100/p85, PHL1414+piG3.



Friday


Strain construction

A 5ml liquid cultured for 4 clones of PHL1414/pIG3 and 4 clones of MC4100/p85 is started.
Extraction and digestion by E and P. The four clones of MC4100/p85 are good.









Previous Week Next Week






ENS assystem Biomérieux INSA INSA