Team:Lyon-INSA-ENS/Project/Industrialization

From 2011.igem.org

(Difference between revisions)
 
(39 intermediate revisions not shown)
Line 16: Line 16:
  <div id="language";>
  <div id="language";>
-
         <img src="https://static.igem.org/mediawiki/2011/0/0e/Drapeau_francais.jpg"; width=20px; /> <a href="https://2011.igem.org/Team:Lyon-INSA-ENS/Project/IndustrializationFr">Version Francaise</a>
+
         <img src="https://static.igem.org/mediawiki/2011/0/0e/Drapeau_francais.jpg"; width=20px; /> <a href="https://2011.igem.org/Team:Lyon-INSA-ENS/Project/IndustrializationFr">Version Fran&ccedil;aise</a>
  </div>
  </div>
Line 42: Line 42:
               <li> <a href="#prospects"> <font color="green"> <b> Other prospects for the "Cobalt Buster" project ?</b> </font> </a> </li>  
               <li> <a href="#prospects"> <font color="green"> <b> Other prospects for the "Cobalt Buster" project ?</b> </font> </a> </li>  
               <br/>
               <br/>
-
               <li> <a href="#prospects"> <font color="green"> <b> To go further : Economic analysis of the electronuclear pattern</b> </font> </a> </li>  
+
               <li> <a href="#further"> <font color="green"> <b> To go further : Economic analysis of the electronuclear pattern</b> </font> </a> </li>  
               <br/>
               <br/>
         </ul>
         </ul>
-
     <br/> <br/><br/><br/>
+
     <br/> <br/>
     <br/>
     <br/>
<p id = "brainstorming"> <font color="green" size="5">
<p id = "brainstorming"> <font color="green" size="5">
Line 54: Line 54:
<div style="margin-left:15%">
<div style="margin-left:15%">
-
   <img src="https://static.igem.org/mediawiki/2011/8/8a/Bioremediation_pipeline.jpg"  width=500px"/>
+
   <img src="https://static.igem.org/mediawiki/2011/b/b4/Engineeringapproach.jpg"  width=500px"/>
</div><br/><br/><br/>
</div><br/><br/><br/>
     <p style="line-height:1.5em">
     <p style="line-height:1.5em">
-
     After several months of reflection and review of the scientific literature "Cobalt Buster" biofilter was born as a filter dedicated to the primary water circuit of nuclear power plants ! </p>
+
     <big>After several months of reflection and review of the scientific literature, the "Cobalt Buster" biofilter was born as a filter dedicated to the primary water circuit of nuclear power plants ! </big></p>
<br/>
<br/>
<br/>
<br/>
Line 87: Line 87:
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
<big>2-  </big> Major preocupation of nuclear industry is <b>the reduction of waste volume </b> and a previous modelization estimated that the "Cobalt Buster" strain is very efficient :</p><br/>
+
<big>2-  </big> A major concern of the nuclear industry is <b>the reduction of waste volume </b> and a previous modeling estimated that the "Cobalt Buster" strain is very efficient (Appl Microbio Biotechnol 2009 81:571- 578):</p><br/>
<p style="line-height:1.5em ; text-align : center"> <b>4 kg of modified bacteria = 8000 kg of ion exchange resins </b></p><br/>
<p style="line-height:1.5em ; text-align : center"> <b>4 kg of modified bacteria = 8000 kg of ion exchange resins </b></p><br/>
<div style="margin-left:10%">
<div style="margin-left:10%">
Line 93: Line 93:
</div><br/><br/>
</div><br/><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
<big>3-  </big> <b>Drastic reduction of the costs of waste processing and conditioning is also a major issue </b>for nuclear industry. Biofilter production is less expensive and the biofilter may prevent damage caused to the resins. It could significantly reduce costs of rehabilitation of primary circuit wastewater.</p><br/><br/>
+
<big>3-  </big> <b>Drastic reduction of the costs of waste processing and conditioning is also a major issue </b>for nuclear industry. The production of biofilters is less expensive and the biofilter may prevent damage caused to the resins. It could significantly reduce costs of rehabilitation of primary circuit wastewater.</p><br/><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
<big>4-  </big> Maintenance phases generate a shortfall of millions of euros and <b>reduction of the duration of maintenance phases</b> represent a major issue.</p><br/><br/>
<big>4-  </big> Maintenance phases generate a shortfall of millions of euros and <b>reduction of the duration of maintenance phases</b> represent a major issue.</p><br/><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
<big>5-  </big> Stocking stations of moderately radioactive waste <b>are rapidly full, and our bacteria could help in the downgrading of these waste to low radioactive waste</b>, which are stocked in other stations, usually more spacious.</p><br/><br/>
+
<big>5-  </big> Storage stations of moderately radioactive waste <b>are rapidly full. Our bacteria could help in downgrading the high volumes of high radioactive waste to low radioactive waste</b>, which are stocked in other stations, usually more spacious. Radioactive cobalt would be concentrated in smaller volumes thanks to the increase of the efficiency of filtration.</p><br/><br/>
     <p style = "text-align : center";>
     <p style = "text-align : center";>
Line 108: Line 108:
<p id="circuit"> <br><font color="green" size="5">
<p id="circuit"> <br><font color="green" size="5">
               Why not in the primary circuit ? (Experts advice)<br><HR>
               Why not in the primary circuit ? (Experts advice)<br><HR>
-
           </font><br/><br/><br/>
+
           </font><br/><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
To include our projet into a realistic approach and close to concerns of today and tomorrow's ingeneers, we notably have discussed the realisation of our biofiltre with M. Brette (Assistant professor in INSA Lyon, doctor in economic sciences), our partnairs (Assystem, EDF) and have a realistic idea of the technical difficulties thanks to the visits we made in nuclear installations (central of Tricastin, area of Centraco) and discussions we had with a Chemist of the nuclear power plant of Bugey.</p><br/>
+
<b>To include our project into a realistic approach</b> and close to concerns of today and tomorrow's engineers, <b>we notably have discussed the realization of our biofilter with M. Brette (Assistant professor in INSA Lyon, doctor in economic sciences) and our partners (Assystem, EDF)</b>. We also have a realistic idea of the technical difficulties thanks to the visits we made in nuclear installations (central of Tricastin, area of Centraco) and discussions we had with a Chemist of the nuclear power plant of Bugey.</p><br/>
<div style="margin-left:15%">
<div style="margin-left:15%">
   <img src="https://static.igem.org/mediawiki/2011/b/ba/Cobaltbusterplace.jpg"  width=500px"/>
   <img src="https://static.igem.org/mediawiki/2011/b/ba/Cobaltbusterplace.jpg"  width=500px"/>
-
</div><br/><br/><br/>
+
</div>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
To get an industrial application technically realistic, our biofiltre have to be designed as a modular innovation, what means that this solution can be applied without any major modification of the structure of the centrale or of the treatment center (plumbing, circuits of the different components, etc.). Indeed, if this solution is kept in a central, it could be rapidly applied in all the centrals of same type. Thus, design of the cartridge of the biofiltre is fundamental to be able to be used into the circuit of nuclear effluents, then be treated as radioactive waste.</b></p><br/>
+
To get an industrial application technically realistic, our biofilter has to be designed as a modular innovation, what means that this solution can be applied without any major modification of the structure of the power plant or of the treatment center (plumbing, circuits of the different components, ...). Thus, design of the cartridge of the biofilter is fundamental to be able to be used into the circuit of nuclear effluents, then be treated as radioactive waste.</b>
-
 
+
<br/>
-
<p style="line-height:1.5em; text-align:center">
+
<br/>
-
<b>From those discussions we know that our project is plausible and could interest industrials but some changes are to be made regarding the uses of our biofilters.</b></p><br/><br/><br/><br/>   
+
<b style="line-height:1.5em">From those discussions we know that our <b>project is plausible and could interest industrialists</b> but some changes have to be made regarding the uses of our biofilters.</b></p><br/><br/><br/><br/>   
<p style="line-height:1.5em">
<p style="line-height:1.5em">
Line 148: Line 148:
</div>
</div>
<br/><br/><br/>
<br/><br/><br/>
-
<p style="line-height:1.5em ; margin-left : 35px"> This exposure rate supposed that if we want to use our "Cobalt Buster" biolfilter, a <b>concrete wall of at least one meter has to be built</b> for each parallel biofilter, and every <b>manipulations have to be automated</b>. </p><br/>
+
<p style="line-height:1.5em ; margin-left : 35%"> This exposure rate supposed that if we want to use our "Cobalt Buster" biofilter, human operators will have to be protected from this high level of radiation, which means that a <b>concrete wall of at least one meter has to be built</b> for each parallel biofilter, and all <b>manipulations have to be automated</b>. This would involve a major modification of the structure of nuclear power plants.</p><br/>
-
<p style="line-height:1.5em;margin-left : 35px">These changes involve too important costs as in France, <b>a modification in one power plant must be also done in the 58 other power plants of the nuclear fleet.</b></p><br/>
+
<p style="line-height:1.5em;margin-left : 35%">These changes involve too important costs as in France, <b style="line-height:1.5em">a modification in one power plant must be also done in the 58 other power plants of the nuclear fleet, for standardization and safety reasons.</b></p><br/>
-
<br/><br/><br/><br/><br/><br/><br/><br/>
+
<br/><br/><br/><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
<big>2-  </big> We also have to consider that during the conventionnal operation, <b>pressure in the primary circuit is up to 155 bars, and temperature up to 327°C (621°F)</b>. As maximum rate of temperature dicrease is estimated at 28°C/hr (82°F/hr)and acceptable temperature for our biofilter is between 20°C to 45 °C, <b>it implies waiting 4 to 5 hours after the opening of the nuclear reactor</b>, before starting the cobalt decontamination.</p>  
+
<big>2-  </big> We also have to consider that during the conventional operation, <b>pressure in the primary circuit can reach up to 155 bars, and temperature up to 327°C (621°F)</b>. As the maximum rate of temperature decrease is estimated at 28°C/hr (82°F/hr)and acceptable temperature for our biofilter is between 20°C to 45 °C, <b>it implies waiting 4 to 5 hours after the opening of the nuclear reactor</b>, before starting the cobalt decontamination.</p>  
<p style="line-height:1.5em">It could be too long because <b>stopping the reactor costs one million euros a day </b>and the maintenance time has to be as short as possible.</p>   
<p style="line-height:1.5em">It could be too long because <b>stopping the reactor costs one million euros a day </b>and the maintenance time has to be as short as possible.</p>   
<br/>
<br/>
-
<br/>
+
 
Line 163: Line 163:
<img src="https://static.igem.org/mediawiki/2011/d/d9/Cobalt_particles.tif.jpg" width=420px"/>
<img src="https://static.igem.org/mediawiki/2011/d/d9/Cobalt_particles.tif.jpg" width=420px"/>
</div>
</div>
-
<br/><br/><br/><br/><br/>
+
<br/><br/><br/><br/>
<p style="line-height:1.5em ; margin-right:55%">
<p style="line-height:1.5em ; margin-right:55%">
-
<big>3-  </big> In the primary circuit, cobalt is in form of ions and particles. <b> Cobalt particles may represent the majority of cobalt and the initial bioremediation strain is design to capture ions of cobalt </b>.</p><br/>
+
<big>3-  </big> In the primary circuit, cobalt is in form of ions and particles.  
 +
<b style="line-height:1.5em"> Cobalt particles may represent the majority of cobalt and the initial bioremediation strain is design to capture ions of cobalt </b>.</p><br/>
<p style="line-height:1.5em ; margin-right:55%">
<p style="line-height:1.5em ; margin-right:55%">
Line 183: Line 184:
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
<big>1-  </big> According to the experts, the "Cobalt Buster" biofilter could be used in the treatment of other effluents, such as those of dismantling stations (STEL, stations of treatments of liquid effluents).</p><br/><br/><br/>
+
<big>1-  </big> According to the experts, the "Cobalt Buster" biofilter could be used in the treatment of other effluents, such as those of dismantling stations or stations of treatments of liquid effluents (STEL).</p><br/><br/><br/>
<div style="margin-left:20%">
<div style="margin-left:20%">
   <img src="https://static.igem.org/mediawiki/2011/6/66/Marcoule.jpg" width=400px"/>
   <img src="https://static.igem.org/mediawiki/2011/6/66/Marcoule.jpg" width=400px"/>
Line 193: Line 194:
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
<b>Moreover, our biofilter may be adaptated on an existing filter and a collaboration subjected to non-disclosure agreement is being discussed with our partner ASSYSTEM.</b></p>
+
<b style="line-height:1.5em">Moreover, a collaboration subjected to non-disclosure agreement is being discussed with one of our partner to realise pilot testing.</b></p>
-
<br/><br/><br/><br/><br/>
+
<br/>
<div style="float : right ; margin-left:0%">
<div style="float : right ; margin-left:0%">
<img src="https://static.igem.org/mediawiki/2011/d/d1/Barboteur.jpg" width=420px"/>
<img src="https://static.igem.org/mediawiki/2011/d/d1/Barboteur.jpg" width=420px"/>
</div>
</div>
-
<br/><br/><br/><br/><br/>
+
<br/><br/><br/>
<p style="line-height:1.5em;margin-right:65%">
<p style="line-height:1.5em;margin-right:65%">
-
<big>2-  </big> The filter could also be used in a <b>bubbling type system to treat contaminated air </b>during the decommissioning of power plants.</p><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/>
+
<big>2-  </big> The filter could also be used in a <b>bubbling type system to treat contaminated air </b>during the decommissioning of power plants.</p><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/><br/>
     <p style = "text-align : center";>
     <p style = "text-align : center";>
Line 214: Line 215:
       </p><br/><br/>
       </p><br/><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
<big>1- </big>
+
As shown by the number of teams interested in strain adherence (<a href="https://2011.igem.org/Team:TU-Delft">TU-Delft 2011</a>), metal absorption (<a href="https://2010.igem.org/Team:Peking">Peking 2010</a>), or radioactivity (<a href="https://2011.igem.org/Team:Osaka">Osaka 2011</a>; <a href="https://2011.igem.org/Team:NYC_Software">NYC_Software 2011</a>), <b>collaborations and common brainstorming may enhance future prospects.</b></p>
-
<br/><br/><br/><br/><br/><br/><br/>
+
<br/>
 +
<p style="line-height:1.5em">
 +
<b>We initiated a collaboration with <a href="https://2011.igem.org/Team:TU-Delft">TU-Delft</a> team in order to compare the efficiency of our two approaches</b> and determine if the overproduction of curli is the best strategy to optimize the adhesion of <i>E. coli</i> strains.</p>
 +
<p style="line-height:1.5em">
 +
<b>Collaborations with Osaka and NYC teams should be considered to optimize the radioactive cobalt bioremediation</b> of our "Cobalt Buster" strain.</p>
 +
<br/>
 +
<p style="line-height:1.5em">
 +
<b>To go further</b>, outside the context of electronuclear pattern, <b>we considered a wider use of the biofilter.</b> The system could involve a <b>large variety of bioremediation strains</b>, each optimized for the capture of one metal and why not other pollutants (hydrocarbons, antibiotics...). These strains <b>could be associated in a complex biofilm to create a broad-spectrum biofilter</b>, as shown in the following video !
 +
</p>
 +
 
 +
<p style = "text-align : center";>
 +
<iframe frameborder="0" width="480" height="360" src="http://www.dailymotion.com/embed/video/xl7q47"></iframe><br /><a href="http://www.dailymotion.com/video/xl7q47_schema-prospects_tech" target="_blank">sch&eacute;ma prospects</a> <i>par <a href="http://www.dailymotion.com/iGEM_Lyon_2011" target="_blank">iGEM_Lyon_2011</a></i>
 +
</p>
 +
 
 +
<br/><br/><br/>
<p style = "text-align : center";>
<p style = "text-align : center";>
Line 223: Line 238:
-
<p id="where"> <br><font color="green" size="4">
+
<p id="further"> <br><font color="green" size="4">
             <big> To go Further :</big> Economic analysis of the electronuclear pattern <br><HR>
             <big> To go Further :</big> Economic analysis of the electronuclear pattern <br><HR>
           </font>
           </font>
Line 238: Line 253:
<br/>
<br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
The Upstream aims to supply centrals in nuclear fuel. It group together several links : mines (mining exploration and natural uranium extraction), chemistry (purification and conversion of uranium to uranium hexafluorure), enrichment (augmentation of isotope U235 content from 0,7% to 3-5%).
+
<b>The Upstream aims to supply centrals in nuclear fuel</b>. It groups together several links : mines (mining exploration and natural uranium extraction), chemistry (purification and conversion of uranium to uranium hexafluorure), enrichment (augmentation of isotope U235 content from 0,7% to 3-5%).
</p><br/>
</p><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
The Construction put together conception, studies and ingeneering for each project of central, fabrication of components, installation and starting of centrals.
+
<b>The Construction put together conception, studies and engineering</b> for each project of central, fabrication of components, installation and starting of centrals.
</p><br/>
</p><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
The operators of Exploitation are watchfull on the well functionning of centrals daily, and calibrate the power of  reactor according to the needings of electric network. Maintenance includes activities necessairy for upkeep, modernisation and extension of the lifetime of nuclear centrals. The outages are important points of this activity: indeed reactors are stopped sometimes during several weeks to refill  in fuel and large-scale maintenance operations.
+
<b>The operators of Exploitation are cautious about the well functioning of centrals daily</b>, and calibrate the power of  reactor according to the needs of electric network. Maintenance includes activities necessary for upkeep, modernization and extension of the lifetime of nuclear centrals. The outages are important points of this activity: indeed reactors are stopped sometimes during several weeks to refill  in fuel and large-scale maintenance operations.
</p><br/>
</p><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
The Downstream of the pattern is divided in two different activities: treatment of used fuel (recycling in MOX for a reuse), and life-ending of nuclear installations (dismantling, redevelopment of areas).
+
<b>The Downstream</b> of the pattern is divided in two different activities: <b>used fuel</b> (recycling in MOX for a reuse), and </b>life-ending of nuclear installations</b> (dismantling, redevelopment of areas).
</p><br/>
</p><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
Because of the huges financial and technological means needed for the development of a business in the electronuclear field, threat of new competitors (new businesses incoming into the market) is low. Consequently, just a few large groups share the four lines of business, even at the world scale (for example AREVA, EDF, GE Energy or Mitsubishi). Suppliers, operators and customers inside the pattern are interconnected, and are quite often subsidiaries of these multinational companies. Competition is very strong because contracts are rare and huge.
+
<b>Because of the huge financial and technological means</b> needed for the development of a business in the electronuclear field, <b>threat of new competitors (new businesses incoming into the market) is low</b>. Consequently, just a few large groups share the four lines of business, even at the world scale (for example AREVA, EDF, GE Energy or Mitsubishi). Suppliers, operators and customers inside the pattern are interconnected, and are quite often subsidiaries of these multinational companies. Competition is very strong because contracts are rare and huge.
</p><br/>
</p><br/>
<p style="line-height:1.5em">
<p style="line-height:1.5em">
-
Thus, pressure on this field are numerous and varied. Political influence on the electronuclear field is quite importante: in France, nuclear holds a paramount place, but politics can at any moment decide to favour other ways of electricity production, as in Germany (solar, windmills, etc.). Therefore role of public power in different countries and of international organizations (for example AIEA, ANDRA) is crucial, because those are the ones which will decide, fix rules and directives. The application of agreements against the global warming by public power (Kyoto, Copenhague) can also impact directly and positively on the electronuclear field, this one giving out no CO2, to produce electricity. However, there are currently two main problems: the becoming of nuclear wastes (for now, stocking of wastes of low, medium and high activity), and the risk of an accident whose consequences would be disastrous for environment ad population. Laws taht have been voted purely restrict this field to allow a permanent control, avoid accidents and protect population. Indeed, from a social outlook, the apprehension facing this strength and the different accidents which occured is still present. Nevertheless, because of the increase of the price of fossil energies (petroleum, gas) and thanks to the researches on new generations of reactors, more effecient, electronuclear field keep its competitivity on the energy market.
+
<b>Thus,sources of pressure on this field are numerous and varied</b>. Political influence on the electronuclear field is quite important: in France, nuclear holds a paramount place, but <b>politics can at any moment decide to favor other ways of electricity production, as in Germany (solar, wind turbines, etc.)</b>. Therefore role of public power in different countries and of international organizations (for example AIEA, ANDRA) is crucial, because those are the ones which will decide, fix rules and directives. The application of agreements against the global warming by public power (Kyoto, Copenhagen) can also impact directly and positively on the electronuclear field, this one giving out no CO2, to produce electricity. <b>However, there are currently two main problems: the becoming of nuclear wastes</b> (for now, stocking of wastes of low, medium and high activity), and <b>the risk of an accident whose consequences would be disastrous for environment and population</b>. Voted laws restrict this field to allow a permanent control, avoid accidents and protect populations. Indeed, from a social outlook, <b>the apprehension facing this strength and the different accidents which occurred is still present</b> <a href="https://2011.igem.org/Team:Lyon-INSA-ENS/Safety/Intro"> (Safety)</a>. Nevertheless, because of the increase of the price of fossil energies (petroleum, gas) and thanks to the researches on new generations of more efficient reactors, the electronuclear field keeps its competitiveness on the energy market.
</p>
</p>
     <br/> <br/>
     <br/> <br/>

Latest revision as of 17:08, 24 October 2011







Industrialization







Team brainstorming








After several months of reflection and review of the scientific literature, the "Cobalt Buster" biofilter was born as a filter dedicated to the primary water circuit of nuclear power plants !





Back to the top



Why a "Cobalt Buster" biofilter in nuclear power plants ?





1- It is known that a pulse of radioactive Cobalt emission occurs in the primary circuit of water, during the maintenance of nuclear power plants when they open the reactor core. This pulse damages the ion exchange resins used to filter the water and reduce its radioactive level.




2- A major concern of the nuclear industry is the reduction of waste volume and a previous modeling estimated that the "Cobalt Buster" strain is very efficient (Appl Microbio Biotechnol 2009 81:571- 578):


4 kg of modified bacteria = 8000 kg of ion exchange resins




3- Drastic reduction of the costs of waste processing and conditioning is also a major issue for nuclear industry. The production of biofilters is less expensive and the biofilter may prevent damage caused to the resins. It could significantly reduce costs of rehabilitation of primary circuit wastewater.



4- Maintenance phases generate a shortfall of millions of euros and reduction of the duration of maintenance phases represent a major issue.



5- Storage stations of moderately radioactive waste are rapidly full. Our bacteria could help in downgrading the high volumes of high radioactive waste to low radioactive waste, which are stocked in other stations, usually more spacious. Radioactive cobalt would be concentrated in smaller volumes thanks to the increase of the efficiency of filtration.



Back to the top



Why not in the primary circuit ? (Experts advice)




To include our project into a realistic approach and close to concerns of today and tomorrow's engineers, we notably have discussed the realization of our biofilter with M. Brette (Assistant professor in INSA Lyon, doctor in economic sciences) and our partners (Assystem, EDF). We also have a realistic idea of the technical difficulties thanks to the visits we made in nuclear installations (central of Tricastin, area of Centraco) and discussions we had with a Chemist of the nuclear power plant of Bugey.


To get an industrial application technically realistic, our biofilter has to be designed as a modular innovation, what means that this solution can be applied without any major modification of the structure of the power plant or of the treatment center (plumbing, circuits of the different components, ...). Thus, design of the cartridge of the biofilter is fundamental to be able to be used into the circuit of nuclear effluents, then be treated as radioactive waste.

From those discussions we know that our project is plausible and could interest industrialists but some changes have to be made regarding the uses of our biofilters.





1- Cobalt released during the opening of the nuclear reactor may represent 150 TeraBecquerel (TBq) of radioactivity (500 m3 of contaminated water with a radioactive Cobalt estimated level of 300 gigaBq / m3).

If the Cobalt biofilter is used as shown above, dose rate for only 1 of the 150 TBq will represent 0,4 sievert per hour (Sv/h) whereas the authorized rate is up to 20 mSv per year.



Calculation of dose rate:
Dose Rate = 0.54 * C * E * P / d²


with
C = the activity Curie
E = energy radiation in MeV
P = the percentage of emission
d = distance from the radiation source

To treat 1TBq of Co60 with d = 1m (1TBq = 30 Curie)
EP = 2.5


we can estimate Dose rate
DR = (0.54 * 30 * 2.5) / 1²
DR = 40 rad / h
DR = 0.4 Gy / h
DR = 0.4 Sv / h






This exposure rate supposed that if we want to use our "Cobalt Buster" biofilter, human operators will have to be protected from this high level of radiation, which means that a concrete wall of at least one meter has to be built for each parallel biofilter, and all manipulations have to be automated. This would involve a major modification of the structure of nuclear power plants.


These changes involve too important costs as in France, a modification in one power plant must be also done in the 58 other power plants of the nuclear fleet, for standardization and safety reasons.






2- We also have to consider that during the conventional operation, pressure in the primary circuit can reach up to 155 bars, and temperature up to 327°C (621°F). As the maximum rate of temperature decrease is estimated at 28°C/hr (82°F/hr)and acceptable temperature for our biofilter is between 20°C to 45 °C, it implies waiting 4 to 5 hours after the opening of the nuclear reactor, before starting the cobalt decontamination.

It could be too long because stopping the reactor costs one million euros a day and the maintenance time has to be as short as possible.






3- In the primary circuit, cobalt is in form of ions and particles. Cobalt particles may represent the majority of cobalt and the initial bioremediation strain is design to capture ions of cobalt .


At this stage of the project we could not assess the ability of the biofilter to capture cobalt particles. However, the final "Cobalt Buster" strain will produce amyloid fibers (curli) that could allow it to fix cobalt particles on its surface.











Back to the top





Where to use "Cobalt Buster" ? (Experts advice)




1- According to the experts, the "Cobalt Buster" biofilter could be used in the treatment of other effluents, such as those of dismantling stations or stations of treatments of liquid effluents (STEL).






In these stations the radioactivity is lower, but the problems related to the cobalt still exist, and temperature and pressure are compatible with the survival of our biofilter (atmospheric pressure and ambient temperature).



Moreover, a collaboration subjected to non-disclosure agreement is being discussed with one of our partner to realise pilot testing.





2- The filter could also be used in a bubbling type system to treat contaminated air during the decommissioning of power plants.


















Back to the top



Other prospects for the "Cobalt Buster" project ?




As shown by the number of teams interested in strain adherence (TU-Delft 2011), metal absorption (Peking 2010), or radioactivity (Osaka 2011; NYC_Software 2011), collaborations and common brainstorming may enhance future prospects.


We initiated a collaboration with TU-Delft team in order to compare the efficiency of our two approaches and determine if the overproduction of curli is the best strategy to optimize the adhesion of E. coli strains.

Collaborations with Osaka and NYC teams should be considered to optimize the radioactive cobalt bioremediation of our "Cobalt Buster" strain.


To go further, outside the context of electronuclear pattern, we considered a wider use of the biofilter. The system could involve a large variety of bioremediation strains, each optimized for the capture of one metal and why not other pollutants (hydrocarbons, antibiotics...). These strains could be associated in a complex biofilm to create a broad-spectrum biofilter, as shown in the following video !


schéma prospects par iGEM_Lyon_2011




Back to the top



To go Further : Economic analysis of the electronuclear pattern




The electronuclear pattern


Because of the implied technologies, ways and the potential risks, nuclear and electronuclear pattern are strategic fields. There are four sectors :



The Upstream aims to supply centrals in nuclear fuel. It groups together several links : mines (mining exploration and natural uranium extraction), chemistry (purification and conversion of uranium to uranium hexafluorure), enrichment (augmentation of isotope U235 content from 0,7% to 3-5%).


The Construction put together conception, studies and engineering for each project of central, fabrication of components, installation and starting of centrals.


The operators of Exploitation are cautious about the well functioning of centrals daily, and calibrate the power of reactor according to the needs of electric network. Maintenance includes activities necessary for upkeep, modernization and extension of the lifetime of nuclear centrals. The outages are important points of this activity: indeed reactors are stopped sometimes during several weeks to refill in fuel and large-scale maintenance operations.


The Downstream of the pattern is divided in two different activities: used fuel (recycling in MOX for a reuse), and life-ending of nuclear installations (dismantling, redevelopment of areas).


Because of the huge financial and technological means needed for the development of a business in the electronuclear field, threat of new competitors (new businesses incoming into the market) is low. Consequently, just a few large groups share the four lines of business, even at the world scale (for example AREVA, EDF, GE Energy or Mitsubishi). Suppliers, operators and customers inside the pattern are interconnected, and are quite often subsidiaries of these multinational companies. Competition is very strong because contracts are rare and huge.


Thus,sources of pressure on this field are numerous and varied. Political influence on the electronuclear field is quite important: in France, nuclear holds a paramount place, but politics can at any moment decide to favor other ways of electricity production, as in Germany (solar, wind turbines, etc.). Therefore role of public power in different countries and of international organizations (for example AIEA, ANDRA) is crucial, because those are the ones which will decide, fix rules and directives. The application of agreements against the global warming by public power (Kyoto, Copenhagen) can also impact directly and positively on the electronuclear field, this one giving out no CO2, to produce electricity. However, there are currently two main problems: the becoming of nuclear wastes (for now, stocking of wastes of low, medium and high activity), and the risk of an accident whose consequences would be disastrous for environment and population. Voted laws restrict this field to allow a permanent control, avoid accidents and protect populations. Indeed, from a social outlook, the apprehension facing this strength and the different accidents which occurred is still present (Safety). Nevertheless, because of the increase of the price of fossil energies (petroleum, gas) and thanks to the researches on new generations of more efficient reactors, the electronuclear field keeps its competitiveness on the energy market.



Back to the top





ENS assystem Biomérieux INSA INSA