Team:Caltech/Week 2
From 2011.igem.org
(Difference between revisions)
Line 6: | Line 6: | ||
== June 19 == | == June 19 == | ||
<p>Collection of soil and water samples from LA River</p> | <p>Collection of soil and water samples from LA River</p> | ||
- | |||
== June 20 == | == June 20 == | ||
- | <p>Lab walkthrough</ | + | <p>Lab walkthrough<br/> |
- | + | Setting up lab, stock supplies, preparation of LB-amp plates<br/> | |
- | + | Test extraction of DNA from BioBrick wells into cloning plates<br/> | |
- | <p>Enrichment cultures of | + | Enrichment cultures of collected samples on minimal media with BPA</p> |
+ | |||
+ | == June 21 == | ||
+ | <p>MoBio kit extraction of DNA from collected samples<br/> | ||
+ | Enrichment cultures of samples in minimal media with 17α-estradiol, nonylphenol, and DDT</p> | ||
}} | }} |
Revision as of 09:14, 22 June 2011
Project |
June 19Collection of soil and water samples from LA River June 20Lab walkthrough June 21MoBio kit extraction of DNA from collected samples
|